Repository logo
Log In(current)
  1. Home
  2. Prodotti della ricerca
  3. A. Contributo su rivista
  4. A1. Articolo in rivista
  5. Electrical loads and power systems for the DEMO nuclear fusion project

Electrical loads and power systems for the DEMO nuclear fusion project

Author(s)
Minucci, S.  
Panella, Stefano
Ciattaglia, Sergio
Falvo, Maria Carmen
Lampasi, Alessandro
Date Issued
2020
Type
article
Volume
13
Issue
9
Start Page
2269
DOI
10.3390/en13092269
Journal
ENERGIES  
Abstract
EU-DEMO is a European project, having the ambitious goal to be the first demonstrative power plant based on nuclear fusion. The electrical power that is expected to be produced is in the order of 700-800 MW, to be delivered via a connection to the European High Voltage electrical grid. The initiation and control of fusion processes, besides the problems related to the nuclear physics, need very complex electrical systems. Moreover, also the conversion of the output power is not trivial, especially because of the inherent discontinuity in the EU-DEMO operations. The present article concerns preliminary studies for the feasibility and realization of the nuclear fusion power plant EU-DEMO, with a special focus on the power electrical systems. In particular, the first stage of the study deals with the survey and analysis of the electrical loads, starting from the steady-state loads. Their impact is so relevant that could jeopardy the efficiency and the convenience of the plant itself. Afterwards, the loads are inserted into a preliminary internal distribution grid, sizing the main electrical components to carry out the power flow analysis, which is based on simulation models implemented in the DIgSILENT PowerFactory software.
Subjects

balance of plant

DEMO

Electric Loads

Nuclear Fusion

Plasma

Power Flow

Power Supply

Power System

Handle
http://hdl.handle.net/2067/46073
Metrics

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify